Open Minutes is an early work in progress.Learn what that means

Jared Gardner

Planning and Zoning Commission member as of June 2026.

Meetings

View meeting →
0:24

Here.

9:35

Thank you. I guess a general question about the context of this application. I don't have a good sense of what it means to I'm looking for the language, to kinda close the open building permit. And I don't know if the R19 designation for the permit suggests that that was from 2019. Can you give me a sense of the timeline and what closing it out means in practice now seven years after the fact.

11:01

Yeah, I have another question unrelated, much more specific and technical. I saw in the application that it said that the lot was seven or sorry, not 70. And I was trying to get a sense of how it did compare to the minimum lot size. I didn't see anything that looked like it would be 45 times, but I was wondering if you know what the number is or if that's correct.

13:21

I think I saw the table I wasn't sure it was in the right spot. But I see 1.25 is the smallest, and it goes up to 7.5 and what looks like a pretty extreme slope.

24:54

Oh sorry, thanks. I intend to support the motion as well. I'll just note in addition we didn't receive any public testimony this evening, but there were two letters included with the application from I take to be neighbors supporting the requested variants. And as well that there are photos that I think further emphasize both how the property, including the garage, is offset, not easily visible or at all visible, maybe from the road, and that when facing both structures, the garage looks much smaller than the house the way that they're oriented.

28:31

All right, thanks. One of your comments got to a question I was curious about, so I figured I would just ask it since it fit well. You mentioned that removing the special limitations would allow building a lower density than would otherwise be required. Were there other special limitations that you were aware of? Sorry, not lowered. Well, lower kind of density. Were there other special limitations that would limit the intended new use of the property?

29:13

I think they're I assume accurately on pages 2 and 3 of the packet we received as well. I don't know if that is what you are looking at or your application.

30:16

Okay, thank you.

46:47

Yes, thank you. I move in case 2026-0065 to recommend to the anchorage assembly approval of the request to rezone a tract of land from CE-B-3 SL, General Business with special limitations to CE-B-3 General Business District.

47:10

Yes I intend to support the motion. I think it meets the rev review criteria as set forth in the staff packet including for the fact that this is an implementing zoning district from for the land use designation under the Chugiak Eagle River Comprehensive Plan update from 2006 that was put in place after the ordinance that added the special limitations to this property. We received some testimony neighbors in opposition to the rezone, which seemed to go primarily to concerns about adding some multi-district housing to this property. I think a lot of the concerns can and should be addressed through the building permit process. Not something that really plays into the criteria for the rezone directly. And I also will just note that one of the implications from this rezone with respect to some of the concerns that we heard is that this actually removes an existing minimum requirement for housing density and will allow potentially lower densities on the property than currently required.

58:20

I move in case 2026-0062 to recommend the Anchorage Assembly approval of a text amendment to title one. Title 21, excuse me, chapter 21.05.040G.2.b. With you specific standards for Turnagain Arm public or private parks to clarify the review process for park master plans.

58:45

Just briefly, I intend to support the motion. I think it's a straightforward clarification that tracks the process that occurs in the Anchorage Bowl that's necessary to remove some ambiguity in the code and I think it meets the approval criteria as set forth on page one in the staff packet.