thank you mr chair Kent Kohlhase, public works director it's a more operational than perhaps the planning development services department but in the in the world of maintenance and operations I did send an email I think to all members in the past week or so explaining widening efforts that are going on across town we typically have between five and six crews working during the day three crews working at night lighting mostly residential streets now but a few of the main since they're still working on so that's a significant effort for them street maintenance supported as did right away and other departments support it for Rondy and it was a very successful effort for street maintenance provides the snow for the snow sculptures as well as the snow for the races and they'll be moving in probably this afternoon start setting up for the Iditarod so they really enjoy that work and take a lot of pride in it still in maintenance and operations in the fleet world we are outfitting a number of the police shop but radio shop are outfitting it a number of new police cars there's control cars this time there's I think 12 goes for detectives there's a number of outrage that are gonna be used by the service officers and there's some other vehicles coordinating pretty heavily between fleet and APD to work to meet their needs as moving along. I guess the last thing in the maintenance and operations world we have received four new sanders that came in that we purchased with the $3.5 million levy that the voters approved last year those are on property I think one or two is more operational and the others are being undergoing the final fitting with radios now they're all the other equipment will be on the road soon and in addition we have the last tranche of our Trackless the Trackless is a brand name is the sidewalk tractors we purchased I believe 14 of those with me's funding the last five have just arrived so a benefit that you're in certainly next year in the traffic world some metrics they use with respect to I think to document traffic speed traffic mods things like that I could provide more information if folks want to that we'll get that that that is something that they work on every year and then they use the bond funding to implement those programs and then they are also working on getting their projects out to bid which aligns with the my next update which is PM and E working on getting about 15 construction projects. So you'll start seeing a number of Yeah coming through the assembly some before the election. Many of them will be after the election because they're funded with bonds that are on the election, presuming the law's passed. The mayor, I think folks may know the mayor is is working on an open house for March 19. With respect to the upcoming law proposition and departments will be staffing that to provide information to voters. The last thing I'd mention in the PME world is The department worked with the administration and provided information on possible designated spending grant for the district city's on third Avenue and 15th. Thank you, Mr. Chair. I guess one other thing I've mentioned is that in the downtown arena, there is a lot of work happening this summer up right. Town square the MD has some work to replant some trees in a number of locations downtown, replace some sidewalks. I'm certainly not missing a number of projects. There are there are 10 or 15 large projects that are happening there. So the municipal managers can be in the working group to align the project managers on all those groups so that we make sure that if we close the road, we're not closing all the roads in the area and adversely affecting businesses to the degree we can. So that's an effort that started last week, and we'll be having some regular meetings with that group and assembling a project management calendar so that all the project managers can be aware of those impacts, and then of course we'll have a outreach each project manager always has public outreach to affect the businesses in the area. That's a comprehensive effort to try to minimize the impact while implementing a number of large projects too. That answer any questions folks may have.
I believe probably I believe that is coming to the assembly next approval for work.
I don't have I don't have a percentage. I did hear from the department yesterday that they think that in the next two to three weeks it should the bulk of the road. I'll verify that and get back to you member Brawley and other members who may be interested in.
I think there's a few things, Mr. Chair. I think we have received in addition to having more staff on board in this winter than we had the luxury of it previous winters. All those folks have done a great job in attracting and hiring folks. The conversion of the talk about the seasonal positions we converted the street maintenance assistance, which allowed us to bring in entry level people who may not have CDL. That is held. We have new equipment. We're just receiving graders that are purchased with the levy, but even prior to that, we had made some investments in equipment. So our graders were well beyond their useful life and breakdowns, so we're seeing fewer breakdowns. I think those certainly help. I think that the snowing year. snow came so fast and so heavy in such a compressed period of time that it was just it was just infeasible to plow the city in our target of 72, 84, 96 hours given the concentration of snow that came at one time. Well we saw in January this year were with snowfall after snowfall after snowfall that generally they were far enough apart that we had time for our crews to meet that better. So I'd say it's a mix of things is more equipment more staffing and the timing of the snow I think plays into the snow events plays in how how how easily we can meet the metrics in our snow
if I may Mr. Chair, some other things that that Paul VanLandingham and his crew are working on and we have bought equipment towards that end you're going to have sand trucks that are equipped with both nose plows and belly plows so they can they can assist in the plowing up we used to have belly plows years and years ago when they went away for some reason that nobody recalls this was years or so ago but they are they're useful and they can team up with a greater on certain streets and certain subdivisions which freeze up a greater than work. So see much benefit this year because those sanders are just coming online but next year we'll have a fleet of them equipped and ready to go.
I used to do that job. and the gate on the end of the grader that is supposed to contain snow as you pass it the right way. Can only contain so much snow if you have more than six or so inches of snow in a snowfall. It spills over. And if you have 10 or 12 inches, it spills over significantly.
Well, it's the volume stuff.
Certainly. Through the chair to Member Baldwin Day and to everyone. We work at both an operational level and a coordination level of the DOT on a very regular basis. I don't know that that's field level constant contact, certainly during snow events with KC Eliason and his team. In addition, the administration is in discussions, and I've been involved in something with the management level that DOT it's a regular topic of discussion. We know that they are challenged with respect to resources and resources both in I presume in equipment and perhaps some personnel. And we know that they've explained to us that their highest priorities are the high speed roads, the high traffic roads. But we have convey to them and I know they received complaints directly from Chris Tit that well the concerns about challenges with sidewalk maintenance. And matter of fact, I spoke with Kurt Warren, who's the head of maintenance just last week about that. And we're gonna we're gonna continue to coordinate at the operational level that that's about all we can do is continue to talk with them, but I guess I would I would offer that there are discussions at the between the administration and the management regarding the system.