1:58:46
Okay. So give you a presentation tonight on where we're at with the Winter Creek trail suspension bridge. This would be the bridge that we're placing the hand tram out there at the winter creek or the glacier creek crossing. So we are to what we call the 35% design phase. And so we've have initial design completed for the bridge. You know the bridge has come from the fact that the hand tram now's been closed for several years. We had two incidents out there several years ago. And following the second incident, we didn't reopen the bridge or the tram. And it really came to light that the tram has probably met its lifespan due to the usage of the trail now. The tram was seeing too much heavy use misuse of the tram and really became sort of a nightmare maintenance Problem for us because we just couldn't keep up with our volunteers and groups and our staff alone to keep it going. So with that, the train was closed and we started looking at alternatives. And through that, we did a feasibility study that looked at several different crossings of the bridge of the glacier creek, which were bridges. And we came to a conclusion that a suspension bridge would be the best crossing to replace the hand tram in that area. We'll show you today is the bridge bridge site, the bridge design and the interpretive shelter that will be created to give an interpreter display for the hand tram and also talk about even earlier crossings about how you got across glacier creek out there. Just to give you a reference here is a problem project location map that if you're not familiar with the hand tram and the new bridge site is. so jumping into it, this is what we're looking at. This is the bridge site plan. We would be using the existing corridor, which the hand tram occupies now to build a new bridge. This bridge would be about 206 feet in length, to be six feet wide to accommodate two way traffic, and it would be referred to what we call a hanging deck suspension bridge. With it, we would build a hand tram interpretive shelter on the Coe Creek side, or what's known as the West Side of the crossing. In it we would display the old hand tram and try to reenact what it looked like when it was in terminal all those years out there and what it's currently like right now. And then tie the trail in its existing location in with a ramped approach up to the bridge. Realizing that we want to make this accessible for everybody in the future, you know, depending on how the trail grows and changes in it. Let's see here. I think this is a repeat. Yep. That's the in that aspect. So this is what the bridge would look like in this aspect. You would see the if it be a suspension cable which would have safety web net in it that would go up to 54 inches. There'd be a handrail on the back side of that safety web net. You have a longitudinal cable that runs across the at seven feet above the base of the deck. So what it does is it gives an opening for people to see out, but to deter for people from getting higher. And it also takes in the fact that we'll have snow load on the bridge in the winter. So that cable being up to seven feet just gives a little extra protection there. One thing I want to point out about this is that we are working in close partnership with US Forest Service to design and build this bridge with the intent that the US forest service will be taking over ownership into the future with this bridge. Sorry, I let somebody in there. And so when we work through these designs and we think about especially like snow load and things like that, we work with the forest service on what they think their management will be like and things like that. So they do consider snow load and how deep it would be on the bridge and how it would impact traffic going across the bridge in the winter and what their management plan will be, which they will probably flush out as we get through the full design here. Decking would be a fiberglass grating with 24 with a 24 inch dog strip on it. One thing we've learned from bridges like this being built in Europe is that dogs have a hard time walking across the grating, but adding in that dog strip gives them more comfortability to cross it and get back and forth. So that's something we picked up there. And then we would use steel towers and cable. There'd be really no wood at all in this construction, just because we want the most durable and long life structure possible out there. In our previous meeting, there was a question about how tall the towers would be, and they would be 26 feet tall on each side. So where the suspension cable goes up to the top of those towers and go across the top of the tower would be 26 feet tall in that aspect. So kind of a basic overrun of what the bridge looks like and like I said, it'd be an existing location. We have some crude drawings in there, but that gives you a res represents where the terminals are on both the east side and the west side. So the Aliaska side and the and the Co Creek Road side for the hand tram right now. And so as you can see on the Alyesco Hotel side, those towers would be back further from the existing front of the hand tram due to the way the hand tram abutments are right now. They sit pretty they sit right on the sheer face of the cliff there. And from the engineer structural engineers, they were comfortable with that. So they'd be moving that back. We would use those abutments a bit in the design, but for the most part, most of the abutments would be new just for the longevity and age. But the existing abutments probably would still live underneath the bridge as they would the bridge would go right over the top of the hand tram abutments out there. Here. The interpretive shelter. So interpretive shelter would be built on the Crow Creek side of the entry to the bridge. We would repurpose the material from the existing shelter out there. And then build this with a slab on grade, an interpretive center. Like I said, the post and beam would be reused, everything we can be reused. And then the hand tram would be put inside, suspended on its shivs there off a cable. And we hope to make it interactive so that people can still get in and out of the hand tram and get a sense of what it was like. And then there would be interpretive displays there that would explain the history of the hand tram, and the construction and the engineering behind it, and the materials. And also probably touch on the original crossings, you know, which were cables going across the creek that people slid back and forth on or skim or skin or ship ship themselves across on. So, anyways, that would give you a sense of what the interpretive center would be out there. And then we would try to repurpose the other hand tram terminal by maybe bringing it back here to the town and using it for some sort of shelter or interpretive display, particularly in town square, maybe the house the original fire engine water tank that we still are looking to redo and have it parked in the industrial park a lot right now. So that's kind of a quick overrun there. See what else I got. That's it. Yeah. So that's where we're at. We are actively discussing this in Gruba Trails Committee, land use and then with GBOS. And we're hoping for support from all three bodies at next month's round of meetings as we're trying to be Proactive to keep this project moving along so that we can hopefully get to a construction in 24 and keep the design team moving along and getting this to a final design, hopefully by the end of the year, if not by early next year and out to bid for construction. The earlier we can get out the bid of construction, the easier it is them to procure all the items that we need for a suspension bridge. So open up the questions.
2:07:51
We would if we have any sort of ramp outside of the actually structure itself, we would most likely use the decking that's similar to what's on the bridge. There is still room for debate here with the design team about how much ramp and decking do we need to do because the more ramp and decking that we add to it, the more expensive the project gets. So we're trying to do this fine balance of like how do we build something, but we don't over engineer it. We have engineer it right so that we can afford it at the same time. So if anything, those areas I think that's really where the force servers gonna have really input like you know, we can work with this, if you can land it at this angle and still get these approaches, we can avoid putting too much decking out there.